WORK ON SILVER ZONE AT BEDOK RESERVOIR ROAD

MP Pritam Singh

 Mr Pritam Singh asked the Minister for Transport (a) when does LTA intend to begin work on the Silver Zone at Bedok Reservoir Road as originally announced on 5 March 2020; and (b) whether these works can be carried out in conjunction with the construction of the cycling path network at the same stretch of road so as to minimise inconveniences to residents.

Mr S Iswaran: As planned, the Land Transport Authority (LTA) will commence works on the Silver Zone at Bedok Reservoir Road by end-2023. These works will be constructed together with the planned cycling path to minimise inconveniences to residents. This is part of the planned 50 Silver Zones that will be completed islandwide by end-2025. 

Ministry of Transport
6 February 2023

https://sprs.parl.gov.sg/search/#/sprs3topic?reportid=written-answer-na-12645